• One piece mandrel design provides a very robust tool design that withstands burst pressure in excess of 20,000 psi.

 

  • Port Jetting™ improves injectivity to formation.

 

  • Opening sequence is controlled by a fit for purpose rupture disc that is designed to resist plugging or bridging at the membrane.

 

  • Mandrel design maintains casing string integrity and yield torque ratings. The tool can be "through torqued" onto the casing string for ease of make up.

 

  • High torque casing connections for ease in matching any number of today's requirements.

 

  • Exceeds all safety and environmental standards.
inject and frac valve logo

START YOUR

COMPLETION OFF RIGHT

The GEODynamics QuickStart® Inject + Frac Valve provides the operator with an initial point to break down the formation and establishes a pump-in port for use in long horizontal completions. The device is comprised of an opening piston that is controlled by a special rupture disc.

The QuickStart® Frac Valve(s) are run as an integral part of the casing string and may be utilized in both cemented and uncemented well bores.

SmartStart / QuickStart / Competitors checklist

Key Features:

Part Number Connection Size Max O.D. Min I.D. Make Up Length (ft) Temp. Rating ˚F Flow Area Torque Rating ft/lbs Working Pressure
TC-QS-450-0000 4.5 5.65 3.34 4 325˚ 6.8 15000 19000
TC-QS-450-0000-SE 4.5 5.65 3.34 4 375˚ 6.8 15000 19000
TC-QS-455-0000 5 5.65 3.34 4 325˚ 6.8 15000 19000
TC-QS-455-0000-SE 5 5.65 3.34 4 375˚ 6.8 15000 19000
TC-QS-551-0000 5.5 6.5 3.75 5.25 325˚ 7.5 20000 20000
TC-QS-551-0000-SE 5.5 6.5 3.75 5.25 375˚ 7.5 20000 20000
TC-QS-580-0000 5.5 7.38 4.6 4 325˚ 7.5 20000 20000
TC-QS-587-0000 5.5 7.38 4.67 4 325˚ 7.5 20000 20000
inject and frac valve logo
SmartStart / QuickStart / Competitors checklist
SmartStart / QuickStart / Competitors checklist
inject and frac valve logo
inject and frac valve logo
SmartStart / QuickStart / Competitors checklist
SmartStart / QuickStart / Competitors checklist

The GEODynamics QuickStart® Inject + Frac Valve provides the operator with an initial point to break down the formation and establishes a pump-in port for use in long horizontal completions. The device is comprised of an Opening Piston that is controlled by a special rupture disc.

The QuickStart® Frac Valve(s) are run as an integral part of the casing string and may be utilized in both cemented and uncemented well bores.

SmartStart / QuickStart / Competitors checklist

Key Features:

  • One piece mandrel design provides a very robust tool design that withstands burst pressure in excess of 20,000 psi.

 

  • Port Jetting™ improves injectivity to formation.

 

  • Opening sequence is controlled by a fit for purpose rupture disc that is designed to resist plugging or bridging at the membrane.

 

  • Mandrel design maintains casing string integrity and yield torque ratings. The tool can be "through torqued" onto the casing string for ease of make up.

 

  • High torque casing connections for ease in matching any number of today's requirements.

 

  • Exceeds all safety and environmental standards.
inject and frac valve logo
SmartStart / QuickStart / Competitors checklist
inject and frac valve logo
SmartStart / QuickStart / Competitors checklist